Company Profile
 News & Events
 
ESL SIGNS WITH LLOYD'S REGISTER FOR CERTIFICATION OF THEIR MANAGEMENT SYSTEM
ESL has signed an agreement with Lloyd's Register Quality Assurance Ltd having its registered... More
   
COCA COLA CHOOSES AKSA FOR ITS LAHORE PLANT
Coca Cola has placed an order for 2x2250 kVA Aksa gensets with Cummins QSK60G4... More
PICTL PLACES AN ORDER FOR ANOTHER 11KV, 1675KVA AKSA GEN-SET
Pakistan International Container Terminal Limited (PICTL) has once again shown confidence... More
ORIX LEASING MAKES AKSA THE BRAND OF CHOICE
The contents of Aksa sets in Orix rental fleet has increased to almost 25%... More
 
ESL HAS MOVED TO NEW PREMISES
ESL has moved to new premises which is completely.... More
 
MOBILINK SIGNS CONTRACT WITH ESL
Pakistan Mobile Corporation Limited has signed the following two contracts with ESL... More
   
ESL WINS SHELL TENDER FOR THE MID REGION
ESL participated in online tender from Shell Pakistan for supply of spares and services and won the... More
   
ESL WINS UET TENDER FOR SALES, SERVICE, INSTALLATION & COMMISSIONING OF GAS SETS
ESL participated in tender from UET and won the following... More
 
   
  View All
 

 
Name Mohammad Nadeem Sadiq
Designation  Director Technical
Qualification BE Mechanical


 
Major personal contributions to Power Generation business representing ESL and other organizations
   
» Team Leader for acquiring flag ship project of Cummins Gas genset at Shaukat Khanum Hospital 1.3MW.
  a Team leader for special designing of project for typical hospital Installation (noise less power house and bump less transfer etc.) and supervised the whole project till commissioning.
  b Led the team for in frame over hauling after 45000 hours.
   
» Team leader for acquiring the 5 MW @ 11,000Volts of Agha Khan Hospital (2x1.5MW Gas plus 1x1MW Diesel Genset).
  a Team leader for special designing of project for typical hospital Installation (noise less power house and bump less transferring system etc) and supervised the whole project. It was a turn key project and material was procured from five different countries.
   
» Team leader for acquiring of 3 MW @ 11,000 Volts of Ayesha Textile Mills, Unit #1 (2x1.5MW Gas Genset).
   
» Team leader for acquiring the 4.5 MW @ 11,000 Volts of ATS Synthetic (3x1.5MW Gas Genset). Designed and supervised the whole project.
   
» Team leader for acquiring of 3 MW of Ayesha Textile Mills, Unit #2 (2x1.5MW Gas Genset).
   
» Team leader for acquiring of 2.2 MW @ 11,000 Volts of University of Engineering and Tech., Lahore (2x1.1MW Gas Genset). Designed and supervised the whole project.
   
» Team leader for acquiring of 3 MW of NESCOM Islamabad, (3x1.1MW Gas Genset).
  a Team Leader for special designing a typical installation in basement with a single entry for air intake, hot air exhaust, flow gas exhaust and light through a tunnel of 200 feet long. Supervised the installation and after market service as well.
   
» Team leader for acquiring of 3 MW Eastern Spinning Mills (3x1MW Diesel Genset). Designed and supervised the whole project.
   
» Team leader for acquiring of 3 MW Master Tiles Gujranwala,(3x1MW Diesel Genset). Designed and supervised the whole project.
   
» Team leader for acquiring of 10 MW of Coca Cola for Lahore, Gujranwala, Rahimyar Khan and Faisalabad Plant .Designed and supervised the whole project.
   
» Team leader for acquiring of 6 MW for Atlas Honda Sheikhupura (6x1MW Diesel Genset). Designed and supervised the whole project.
   
» Team leader for acquiring of 1.6 MW @11,000 for Honda Cars (1x1.6MW Diesel Genset). Designed and supervised the whole project.
   
» Team leader for acquiring of 1.2 MW for Honda Cars (1x1.2MW Diesel Genset). Designed and supervised the whole project.
   
» Team Leader for acquiring of 3.2 MW for Interloop Faisalabad (2x1.6MW diesel gensets).
   
» Team Leader for acquiring of 1.6 MW for DHA Islamabad (2x800KW diesel gensets).
   
» Team Leader for acquiring of 2.4 MW North West Hospital Peshawar (3x800 KW diesel gensets).
  a Team leader for special designing of project for Typical Hospital Installation (noise less power house in basement and bump less transferring system etc ) and supervised the whole project. It was a turn key project including 11,000 Volts equipment e.g transformers, switch gears etc.