| Name |
Mohammad Nadeem Sadiq |
| Designation |
Director Technical |
| Qualification |
BE Mechanical |
|
|
| |
| Major personal contributions to Power Generation business representing ESL and other organizations |
| |
|
| » |
Team Leader for acquiring flag ship project of Cummins Gas genset at Shaukat Khanum Hospital 1.3MW. |
| |
a |
Team leader for special designing of project for typical hospital Installation (noise less power house and bump less transfer etc.) and supervised the whole project till commissioning. |
| |
b |
Led the team for in frame over hauling after 45000 hours. |
| |
|
| » |
Team leader for acquiring the 5 MW @ 11,000Volts of Agha Khan Hospital (2x1.5MW Gas plus 1x1MW Diesel Genset). |
| |
a |
Team leader for special designing of project for typical hospital Installation (noise less power house and bump less transferring system etc) and supervised the whole project. It was a turn key project and material was procured from five different countries. |
| |
|
| » |
Team leader for acquiring of 3 MW @ 11,000 Volts of Ayesha Textile Mills, Unit #1 (2x1.5MW Gas Genset). |
| |
|
| » |
Team leader for acquiring the 4.5 MW @ 11,000 Volts of ATS Synthetic (3x1.5MW Gas Genset). Designed and supervised the whole project. |
| |
|
| » |
Team leader for acquiring of 3 MW of Ayesha Textile Mills, Unit #2 (2x1.5MW Gas Genset). |
| |
|
| » |
Team leader for acquiring of 2.2 MW @ 11,000 Volts of University of Engineering and Tech., Lahore (2x1.1MW Gas Genset). Designed and supervised the whole project. |
| |
|
| » |
Team leader for acquiring of 3 MW of NESCOM Islamabad, (3x1.1MW Gas Genset). |
| |
a |
Team Leader for special designing a typical installation in basement with a single entry for air intake, hot air exhaust, flow gas exhaust and light through a tunnel of 200 feet long. Supervised the installation and after market service as well. |
| |
|
| » |
Team leader for acquiring of 3 MW Eastern Spinning Mills (3x1MW Diesel Genset). Designed and supervised the whole project. |
| |
|
| » |
Team leader for acquiring of 3 MW Master Tiles Gujranwala,(3x1MW Diesel Genset). Designed and supervised the whole project. |
| |
|
| » |
Team leader for acquiring of 10 MW of Coca Cola for Lahore, Gujranwala, Rahimyar Khan and Faisalabad Plant .Designed and supervised the whole project. |
| |
|
| » |
Team leader for acquiring of 6 MW for Atlas Honda Sheikhupura (6x1MW Diesel Genset). Designed and supervised the whole project. |
| |
|
| » |
Team leader for acquiring of 1.6 MW @11,000 for Honda Cars (1x1.6MW Diesel Genset). Designed and supervised the whole project. |
| |
|
| » |
Team leader for acquiring of 1.2 MW for Honda Cars (1x1.2MW Diesel Genset). Designed and supervised the whole project. |
| |
|
| » |
Team Leader for acquiring of 3.2 MW for Interloop Faisalabad (2x1.6MW diesel gensets). |
| |
|
| » |
Team Leader for acquiring of 1.6 MW for DHA Islamabad (2x800KW diesel gensets). |
| |
|
| » |
Team Leader for acquiring of 2.4 MW North West Hospital Peshawar (3x800 KW diesel gensets). |
| |
a |
Team leader for special designing of project for Typical Hospital Installation (noise less power house in basement and bump less transferring system etc ) and supervised the whole project. It was a turn key project including 11,000 Volts equipment e.g transformers, switch gears etc. |